Solar panel installation

We design and install solar for homes and businesses across England, Scotland and Wales. Every job begins with a free survey of your actual roof, because whether solar is worth doing depends on your building — not on a national average.

How it works

Generate it, use it, sell what's left.

Solar panels turn daylight into electricity — not direct sunshine, daylight, which is why they still generate on an overcast day in Manchester in February, just less than they would in June.

That electricity goes to whatever is running in your building at the time. Anything you don't use is either stored in a battery, if you have one, or exported to the grid, and your supplier pays you for it under the Smart Export Guarantee.

The value sits mostly in the first part. Electricity you use yourself replaces electricity you would have bought, which is worth considerably more than the rate you get for exporting. That is why how and when you use power matters as much as how big the array is, and why we ask about it at survey.

Solar panel array generating under a bright, partly clouded sky
Suitability

What decides whether your roof suits solar.

These are the things we actually measure on the survey. Any one of them can change the answer, which is why we will not quote a roof we have not looked at.

  • Which way the roof faces. South is ideal. East and west both work and are very common — an east-west split can even suit a household that uses power in the morning and evening rather than the middle of the day. Due north is the one orientation we will usually advise against, and we will tell you so rather than sell you a poor array.
  • Pitch. Somewhere around 30 to 40 degrees is the sweet spot in the UK. Shallower and steeper both still work, and flat roofs are fine with a ballasted or mounted frame, though that changes the fixing method and the loading.
  • Shading. A chimney, a neighbouring building, a tall tree or even a soil vent pipe can knock out more generation than people expect, because shade on one part of a string affects more than that one panel. Where shading is unavoidable we specify optimisers or micro-inverters so the rest of the array keeps working properly.
  • Roof covering and condition. Concrete tile, slate, clay and metal all have different fixings. What matters more is condition: if the roof needs attention it should be sorted before panels go on, because taking an array off to fix a leak is expensive and avoidable. We will say so if we see it.
  • The structure underneath. Panels, rails and fixings add weight, and wind and snow loading add more. We check rafter size and spacing, and where there is any doubt we ask for a structural engineer rather than guess.
  • Your electrical supply. We look at the consumer unit, the meter, the earthing and bonding arrangement, whether there is a spare way, and whether the supply is looped with a neighbour — that last one needs sorting with the network operator before an install, and it is much better found at survey than on the day.
  • Access. Scaffolding, parking, and anything in the way such as a conservatory. It affects how the job runs and what it costs, so it is better known up front.
Specifying the system

Sized for your building, not for a brochure.

How big a system

Driven by usable roof area, your electricity consumption and how much of it falls in daylight hours. A bigger array is not automatically better — past a point you are generating surplus you sell cheaply rather than use. We size against what you actually consume.

Battery storage

A battery holds daytime generation for the evening, which is when most households use the most power. It lifts the share you use yourself considerably. It is not essential, and for a business running machinery through the day it is often unnecessary — we will tell you which case you are.

Export payments

Every large supplier must offer a Smart Export Guarantee tariff for the surplus you send back. Rates vary a lot between suppliers, and the system has to be registered by an MCS certified installer for you to claim. You also need a smart meter that records export.

Planning permission

For most homes, none is needed. Roof-mounted solar is permitted development as long as the panels sit below the ridge line and do not project far from the roof slope.

The exceptions are listed buildings, conservation areas, National Parks and anywhere covered by an Article 4 direction, where a front-facing array in particular may need consent. Flats and some leasehold properties have their own restrictions. We check this as part of the survey rather than leaving it with you.

Grid connection

Your Distribution Network Operator has to know about any generation connected to their network. Which process applies depends on system size.

Up to 3.68kW per phase falls under G98, which is a notification made after commissioning. Anything larger needs G99 approval before the installation happens, and that can take several weeks. It is one of the main reasons larger and commercial jobs need starting earlier than people expect, and we handle the application either way.

Commercial solar

Business roofs often make the better case.

A business that runs through the working day consumes most of what it generates at the moment it is generated, rather than exporting it cheaply and buying it back expensively in the evening. That is the single biggest factor in how well solar performs, and it is why warehouse, workshop, farm and office roofs frequently stack up better than domestic ones.

Commercial work differs in the detail: larger arrays almost always need G99 approval ahead of installation, three-phase supplies need checking, half-hourly consumption data gives a far more accurate picture than an estimate, and roof structure and fire compliance carry more weight. We survey for all of it.

How a job runs

From first call to commissioning.

One

Survey

We measure the roof, check shading, structure and your electrics, and look at how you use energy. Free, and about an hour.

Two

Design and quote

A layout and system size for your building, with a fixed price and any funding you qualify for already applied.

Three

Approvals

We handle the DNO application and any planning check, so nothing stalls on paperwork at the last minute.

Four

Install and sign-off

Typically a day or two on a domestic roof. MCS registration, certificates and handover follow on completion.

Questions

Solar, answered plainly.

Do solar panels work in the north of England or Scotland?

Yes. Panels run on daylight rather than direct sun, so they generate in overcast conditions too. A northern roof will produce somewhat less across a year than the same roof in Cornwall, and we account for that honestly when we design a system rather than quoting a best case you will not hit.

How long does the installation take?

Most domestic installations take one to two days on site once scaffolding is up. Adding a battery usually adds some hours rather than days. Commercial jobs vary with the size of the array and the grid connection. The longer part of the timeline is usually the approvals, not the work itself.

Will panels damage my roof?

Not when they are fitted correctly. Mounting hooks are fixed into the rafters and the covering is reinstated around them. The risk comes from fitting to a roof that was already in poor condition, which is exactly why we check it at survey and will tell you if repairs should come first.

Do I need a battery?

No, and plenty of systems are installed without one. A battery raises how much of your own generation you use rather than export, which matters most for households out during the day and returning in the evening. For a business consuming power through daylight hours it is often not needed at all.

Why does the installer need to be MCS certified?

Because a Smart Export Guarantee tariff requires an MCS certified installation, as do most manufacturer warranties and some insurers. Every system we install is registered by an MCS certified installer, and we confirm who is registering your job before work starts.

Can I get solar through a government grant?

Sometimes. Solar is normally funded as part of a wider package alongside insulation or heating rather than on its own, through routes like the Warm Homes: Local Grant which is income assessed and delivered by your local council. We check what you qualify for free of charge — see funding and grants.

Find out what your roof would actually do.

A free survey, real figures for your building, and a straight answer if solar is not the right call.